🖥️

Data Center UPS

Data centers cannot tolerate even seconds of downtime. Naradex AGM batteries provide the instantaneous backup power that keeps servers, storage, and network equipment running during power transitions.

The Challenge

  • Millisecond power interruptions can crash servers and corrupt data
  • Large UPS installations require hundreds of batteries with consistent quality
  • Battery replacement in live data centers demands high reliability and predictability
  • Rising energy costs pressure operators to maximize battery efficiency and lifespan

The Naradex Solution

Naradex batteries are tested and proven compatible with all major UPS brands — Schneider Electric (APC), EATON, ABB, Vertiv, and more. Our ND12 series with PAM additives delivers 30% more cyclic life than standard AGM, reducing replacement frequency and total cost of ownership.

Compatible with All UPS Brands

Drop-in replacement for Schneider, EATON, ABB, Vertiv, Huawei, and 10+ other UPS systems.

30% More Cyclic Life

PAM additive technology extends cycle life to 800 at 50% DOD — reducing replacement costs.

Fire Resistant ABS (UL94-V0)

Safety-first design meets data center fire protection requirements.

Consistent Quality

IQC→PQC→OQC quality system ensures every battery in your bank performs identically.

Technical Overview

Typical Configuration192V / 240V / 384V DC strings
Backup Duration5-30 minutes (bridge to generator)
Compatible UPSAPC, EATON, Vertiv, ABB, Schneider, Huawei
Safety RatingUL94-V0 fire resistant container
Quality AssuranceIEC 60896-21/22 certified

Data Center UPS FAQ

Are Naradex batteries UL listed for data center use?
Naradex batteries use UL94-V0 rated fire resistant ABS containers and are tested to IEC 60896-21/22 standards. They carry CE certification (EMC Directive 2014/30/EU). Contact us for specific UL listing documentation for your project requirements.
How do I size a UPS battery bank for my data center?
Battery sizing depends on your UPS capacity (kVA), load (kW), DC voltage string, and required backup time. For example, a 100kVA UPS at 80% load with 192V DC requires approximately 32 × ND12-100 batteries for 10 minutes of backup. We provide free sizing assistance — send us your UPS specifications.
Can I mix Naradex batteries with existing batteries in my UPS?
We do not recommend mixing new and old batteries or batteries from different manufacturers in the same string. Differences in internal resistance and capacity will cause uneven charging and reduce overall system reliability. We recommend replacing entire strings at once.
What warranty do Naradex batteries carry for data center applications?
Naradex offers warranty terms based on the application and purchase volume. Contact our sales team for specific warranty details for your data center project. All batteries are backed by our ISO 9001 certified manufacturing quality system.

Need Batteries for Data Center UPS?

Get a custom battery solution for your project. We provide free sizing assistance and factory-direct pricing.